HMI’s
|
1@6kw Arri fresnel
|
magnetic ballast,1@headcable
|
1 @ double windup
|
|
2 @ 4kw par Quartz colour
|
f/free 1 @ headcable each
|
1
@ double,1 @single
windup
|
|
1 @ 575kw par
|
mag
ballast,1 @ headcable
|
1 @ combo
|
|
1 @ 200w par
|
f/free,1 @ headcable
|
1 @ 5/8 stand
|
Tungsten
|
1 @ 10kw
vega
|
2 @ 63a 1ph cable
|
2 @ combo
|
|
2 @ 5kw Pollux
|
4 @ 32a 1ph cable
|
2 @ combo
|
|
4 @ blondes
|
8 @ 10a cable
|
2 @ 5/8 stands
|
|
4 @ redheads
|
8 @ 10a cable
|
2 @ 5/8 stands
|
|
2 @ mizars(300,500,or 650w )
|
2 @ 10a cables
|
2 @ 5/8 stands
|
|
3 @ dedos
|
1 @ 10a cables
|
2 @ 5/8 stands
|
Kino
flo
|
1 @ 4x4’
|
1 @ 10a cable
|
1 @ 5/8 stand
|
|
1@ flathead 80 day/tung tubes
|
1 @ 10a cable
|
1 @ combo
|
|
1 @ 4 x 2’ Diva day/tung tubes
|
1 @ 10a cable
|
1 @ 5/8 stand
|
|
|
Stands
& Rigging gear
|
Daylight
Control
|
|
|
2 @ 12x12 Frame
|
|
additional to above
|
Sail,silk,griff,black,Lame silver/gold
|
|
14 @ cee stands
|
2 @ 6x6 kit
|
|
2 @ cee boom clamps
|
silk or sail,griff,black,silver
|
|
4 @ tubing holders
|
8 @ 4x4 diff frames ( knife edge )
|
|
30 @ sandbags
|
|
|
1 @ handcarts
|
|
|
1 @ loadcarrier
|
|
Consumables
|
CTO,CTB,CTS,Diff, x 1 of each
|
Full,1/2,1/4
|
|
6 @ ploy sheet 2.4x1.2 VH Grade
|
|
|
12 rolls tiki tape
|
|
|
6 hanks sash cord
|
|
|
Rigging Gear
|
|
|
|
6
@ Welding clamp
|
|
6
@ mafher clamp
|
|
6
@ cardelelli clamp
|
|
4
@ baby plates
|
|
2
@ magic arms
|
|
6
@ 41/2 grip heads
|
|
4
@ polyholder
|
|
Additional Gear Lists
Bus
stop
Stickmen
|
|
|
Terms &
Conditions Payment 7 days after
E.O.M. Tungsten bulbs charged as used unless covered by bulb-time. Bulbs broken in transit or in use will be
charged. All other bulb losses are covered by bulb-time.
Subject to supply stocks replacement lamps will be
carried. All lost, damaged or destroyed equipment/vehicles,
in any cause whatsoever (including the acts negligent or
not of technicians) will be able to be claimed on the
production insurance for full replacement value or 10%
will need to be added to the invoice. The Hirer or
Production company will until the equipment has been
replaced or repaired pay the hire charge on the equipment
(including if applicable charges outside the original hire
period). A confirmed booking is considered work in
progress and if cancelled will be charged for on 100% of
the cancellation fee regardless of the time frame
involving the confirmation. Please be aware that a charge
will be incurred based on the following, cancellation fee
equal to 1 day truck, 1 day generator, 1 day labour, 1
day 12kw hire as an average loss of earnings for every
days work lost be that a pencil or conformation. This
clause is outside the terms of the Blue book
and will only be charged if work is lost be that a pencil
or conformation. On acceptance of a booking though my
agent it is deemed that you have read these terms and
conditions and accept the above clauses.
|